The 2026 Red Book consultation: proposal or current rule?

Separate the UK’s proposed street-works safety changes from the published code and England’s separate coordination update.

A proposed safety change can be worth discussing long before it becomes an instruction for a live worksite. The important habit is labelling its status. The UK’s 2026 Red Book consultation is a useful example: read the draft to understand the questions being asked, while keeping the current requirements for the relevant nation and road separate.

Source-checked . This is an original TTM.plus explainer, not an official standard, training assessment or worksite design. Use the current requirements for your location and the people responsible for the work.

A live consultation, not a final replacement

The Department for Transport’s consultation runs from 21 September to 14 December 2026. It seeks views on a draft update to Safety at Street Works and Road Works. Proposed subjects include accessible pedestrian routes, cycle routes, road closures and clearer treatment of legal duties and advice. These are proposals at the review date of this guide; a draft layout should not be described as an adopted standard.

Read the source: DfT: 2026 safety-code consultation and proposed changes

Keep the published documents distinct

The official publication page still identifies the 2013 safety code as its latest version. Its scope excludes all motorways and dual carriageways with a speed limit of 50 mph or more. Confirm the appropriate requirements with the relevant authority rather than extending that scope yourself.

Read the source: DfT: published Safety at Street Works and Road Works code

A separate 2026 change for England

DfT’s March 2026 coordination code applies from 10 April 2026 and concerns the coordination of street and road works. That publication is separate from the proposed Red Book safety update. Similar document names are a reason to check the full title, purpose, geography and effective date in a briefing pack.

Read the source: DfT: coordinating street works, March 2026 edition

Turn the consultation into a useful team discussion

  • Choose one real issue your team encounters, such as continuity of pedestrian access. Describe the problem without uploading personal details or identifiable incident material to a public discussion.
  • Read the relevant current provision and the proposed text side by side. Label both versions and record the exact question the consultation asks.
  • Discuss how a change might affect planning, equipment, training or inspection. Separate an observation from an assumption about future requirements.
  • Use the official consultation route if you decide to respond. Recheck whether a response period is still open before sharing it as an opportunity.

Before using a saved copy

Check the relevant UK nation, road type, issuing authority and publication status. After the consultation closes, look for an official outcome or replacement publication rather than assuming the draft became effective on the closing date.

Check the issuing authority

Official sources

Links and publication status were checked on 2026-10-22. Follow the source for subsequent changes; a review date is not a promise that guidance will stay unchanged.

  1. DfT: 2026 safety-code consultation and proposed changes
  2. DfT: published Safety at Street Works and Road Works code
  3. DfT: coordinating street works, March 2026 edition